Displacements of a road embankment above the strengthened substrateRead MoreDisplacements of a road embankment above the strengthened substrateStrains and displacements at the base of a road embankmentRead MoreStrains and displacements at the base of a road embankmentDFOS strain measurements of an active road located within a mining areaRead MoreDFOS strain measurements of an active road located within a mining areaStrain and shape measurements in composite pipelinesRead MoreStrain and shape measurements in composite pipelinesStrain and displacement monitoring inside a road structureRead MoreStrain and displacement monitoring inside a road structureSewer concrete collector refurbishment: strains, cracks and displacement measurementsRead MoreSewer concrete collector refurbishment: strains, cracks and displacement measurementsPEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshRead MorePEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshPEBSTER (1×1 m): strains and displacements in piled embankment with a steel meshRead MorePEBSTER (1×1 m): strains and displacements in piled embankment with a steel mesh Prev1 2
Displacements of a road embankment above the strengthened substrateRead MoreDisplacements of a road embankment above the strengthened substrate
Strains and displacements at the base of a road embankmentRead MoreStrains and displacements at the base of a road embankment
DFOS strain measurements of an active road located within a mining areaRead MoreDFOS strain measurements of an active road located within a mining area
Strain and shape measurements in composite pipelinesRead MoreStrain and shape measurements in composite pipelines
Strain and displacement monitoring inside a road structureRead MoreStrain and displacement monitoring inside a road structure
Sewer concrete collector refurbishment: strains, cracks and displacement measurementsRead MoreSewer concrete collector refurbishment: strains, cracks and displacement measurements
PEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshRead MorePEBSTER (5×5 m): strains and displacements in piled embankment with a steel mesh
PEBSTER (1×1 m): strains and displacements in piled embankment with a steel meshRead MorePEBSTER (1×1 m): strains and displacements in piled embankment with a steel mesh