Measurements of a railway line above the substrate strengthened with slurry wallsRead MoreMeasurements of a railway line above the substrate strengthened with slurry wallsDisplacements of a road embankment above the strengthened substrateRead MoreDisplacements of a road embankment above the strengthened substrateStrains and displacements at the base of a road embankmentRead MoreStrains and displacements at the base of a road embankmentPEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshRead MorePEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshPEBSTER (1×1 m): strains and displacements in piled embankment with a steel meshRead MorePEBSTER (1×1 m): strains and displacements in piled embankment with a steel mesh
Measurements of a railway line above the substrate strengthened with slurry wallsRead MoreMeasurements of a railway line above the substrate strengthened with slurry walls
Displacements of a road embankment above the strengthened substrateRead MoreDisplacements of a road embankment above the strengthened substrate
Strains and displacements at the base of a road embankmentRead MoreStrains and displacements at the base of a road embankment
PEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshRead MorePEBSTER (5×5 m): strains and displacements in piled embankment with a steel mesh
PEBSTER (1×1 m): strains and displacements in piled embankment with a steel meshRead MorePEBSTER (1×1 m): strains and displacements in piled embankment with a steel mesh