Category News

Hybrid system for bridge monitoring

Our latest implementation. New five-span bridge, with a total length of over 267 m, was constructed using the incremental launching method ILM. The cross-section is a prestressed box with a height of 3.5 m. It was decided to equip the…

Hybrid monitoring system using EpsilonSensor

Another exciting installation behind us! This time we equipped the Extradosed bridge managed by Generalna Dyrekcja Dróg Krajowych i Autostrad (division in Łódź) with a hybrid monitoring system. In addition to fibre optic sensors (EpsilonSensor) for periodic readings, we also…