Strains and displacements in asphalt layers: dynamic load testsWeiterlesenStrains and displacements in asphalt layers: dynamic load testsStrains and displacements at the base of a road embankmentWeiterlesenStrains and displacements at the base of a road embankmentDisplacements of a road embankment above the strengthened substrateWeiterlesenDisplacements of a road embankment above the strengthened substrateDFOS strain measurements of an active road located within a mining areaWeiterlesenDFOS strain measurements of an active road located within a mining areaStrain and shape measurements in composite pipelinesWeiterlesenStrain and shape measurements in composite pipelinesStrain and displacement monitoring inside a road structureWeiterlesenStrain and displacement monitoring inside a road structureSewer concrete collector refurbishment: strains, cracks and displacement measurementsWeiterlesenSewer concrete collector refurbishment: strains, cracks and displacement measurementsPEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshWeiterlesenPEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshPEBSTER (1×1 m): strains and displacements in piled embankment with a steel meshWeiterlesenPEBSTER (1×1 m): strains and displacements in piled embankment with a steel mesh zurück1 2
Strains and displacements in asphalt layers: dynamic load testsWeiterlesenStrains and displacements in asphalt layers: dynamic load tests
Strains and displacements at the base of a road embankmentWeiterlesenStrains and displacements at the base of a road embankment
Displacements of a road embankment above the strengthened substrateWeiterlesenDisplacements of a road embankment above the strengthened substrate
DFOS strain measurements of an active road located within a mining areaWeiterlesenDFOS strain measurements of an active road located within a mining area
Strain and shape measurements in composite pipelinesWeiterlesenStrain and shape measurements in composite pipelines
Strain and displacement monitoring inside a road structureWeiterlesenStrain and displacement monitoring inside a road structure
Sewer concrete collector refurbishment: strains, cracks and displacement measurementsWeiterlesenSewer concrete collector refurbishment: strains, cracks and displacement measurements
PEBSTER (5×5 m): strains and displacements in piled embankment with a steel meshWeiterlesenPEBSTER (5×5 m): strains and displacements in piled embankment with a steel mesh
PEBSTER (1×1 m): strains and displacements in piled embankment with a steel meshWeiterlesenPEBSTER (1×1 m): strains and displacements in piled embankment with a steel mesh